• Login
  • Register

No products in the cart.

Leandemy
  • Home
  • Lean production System
  • Lean six sigma Tools
  • Lean metrics
  • Foster Lean culture
  • Shop
No Result
View All Result
Leandemy
  • Home
  • Lean production System
  • Lean six sigma Tools
  • Lean metrics
  • Foster Lean culture
  • Shop
  • Login
  • Register

No products in the cart.

Home Lean six sigma Tools

Six Sigma DMAIC: The Ultimate Guide to Process Variance Reduction

October 11, 2025 - Updated on November 9, 2025
Reading Time: 15 mins read
0
six sigma DMAIC

Six sigma DMAIC methododlogies

742
SHARES
3.5k
VIEWS
Share on FacebookShare on Twitter

In the relentless pursuit of operational excellence and peak performance, businesses across the globe have turned to a powerful, data-driven methodology: Six Sigma DMAIC. This structured problem-solving framework is the engine behind countless success stories, from multinational corporations streamlining manufacturing to healthcare providers improving patient outcomes.

Based on Academia.edu paper with content Related to DMAIC there were 12,896 paper this is shows that DMAIC still relevant to the current bussiness competitive advantage . Other paper from Mdpi.com indicate that  It shows that DMAIC remains central for structured improvement of existing processes when augmenting with new technology (e.g. IoT, digital twins). From research on literature it shows proposed framework integrates the structured problem-solving approach with advanced technologies to align operational efficiency with environmental and economic sustainability.

RelatedPosts

Six Sigma Green Belt Cost : Evaluating true cost and how it boost your career

Six Sigma Tools : Mastering 55 tools to Unlock Profitable Growth

ASQ six sigma certification Cost : Hidden cost you may avoid

This blog for Six sigma DMAIC guide will break down each phase of the DMAIC process, providing you with the knowledge and tools to embark on your own continuous improvement journey.

 

What is Six Sigma and the DMAIC Methodology?

six sigma DPMO yield conversion

Before diving into DMAIC, it’s crucial to understand its parent philosophy: Six Sigma.

Six Sigma is a disciplined, statistical-based, data-driven approach for eliminating defects in any process – from manufacturing to transactional and from product to service. The term “Sigma” is a statistical unit of measure that reflects how far a given process deviates from perfection. A “Six Sigma” process is one that produces only 3.4 defects per million opportunities (DPMO), meaning it operates at a 99.99966% success rate.

For example call center company for promotion and telemarketing made 500 call in each day if the company run with 1 sigma process there will be  346 Call succeeded with rest were failure it does not count the result fo the telemarketing funneling , while 3 sigma process will end up pretty good 466 Call succeded as procedure while 6 sigma proces will lead 500 call succeeded.

given the example above there will be rarely process within company within 1 sigma level pretty much we will see majority already within 3 -4 sigma then the question why bother ? to elevate to 6 sigma process ?

to give you example one of most bussiest airport were Hartsfield-Jackson Atlanta International (ATL): with 796,224 flights with those numbers there were 2 flights incident In 2024, there were two significant incidents at Hartsfield-Jackson Atlanta International Airport: 

on September 10, a collision between two Delta planes on the taxiway damaged the tail of one aircraft, and on August 27, a tragic incident involving a tire explosion at a maintenance facility resulted in two fatalities and one injury. 

The September collision between a Delta Airbus and an Endeavor Air CRJ900 resulted in a minor injury and caused a delay for passengers on the Airbus, while the August incident involved Delta employees working on a tire at a maintenance facility.  

imagine the airport alredy within 6 sigma level on numbers but it still has 2 incidents that cause fatalities and injury by saying as we move to large number and more stable we need more control to ensure bussiness processes not pose a risk.

The primary goal of Six Sigma is to minimize variability in processes, which is the root cause of defects and errors. This is achieved through two key project methodologies:

1. DMAIC (Define, Measure, Analyze, Improve, Control): Used for improving existing processes that are falling below specification and need incremental improvement.

2. DMADV (Define, Measure, Analyze, Design, Verify): Used for creating new processes or products at Six Sigma quality levels.

This guide focuses exclusively on DMAIC, the most widely used and applicable methodology for most businesses.

DMAIC provides a rigorous, five-phase framework that guides project teams from problem identification to sustainable solution implementation. It ensures that improvements are based on solid data and statistics, not just gut feelings or best guesses.

 

The Five Phases of DMAIC: A Deep Dive

 

The power of DMAIC lies in its structure. Each phase builds upon the previous one, creating a logical flow that prevents teams from skipping crucial steps (like implementing a solution before truly understanding the root cause). Let’s explore each phase in detail.

DMAIC Phase 1: Define

Fisrt step of DMAIC were Define the problem, Many problem solving were wrong from the start becaue poor or lack of problem statement. By identify clear problem statement we are halfway to solving the issue below key point for DMAIC Define phase :

Define Phase Goal:

A project that starts with a poorly defined problem is destined to fail. The Define phase sets the foundation for everything that follows.

  • clearly articulate the problem,by defining VoC ( voice of Customer ) & VoB ( voice of Bussiness )
  • The project goals, and the scope.
  • The Project resource and Charter
  • Improved Process SIPOC

DMAIC : Define phase Key Activities 

In define phase we outght to linkage the bussiness and customer or ussually we called Linking VoC & VoB.

in those regards we split the activities in the Define phase :

A. Identify the Problem:

Write a clear problem statement. It should be specific, measurable, and focused on the gap between current and desired performance.

Example of a bad problem statement: “Our customer service is bad.”

Example of a good problem statement: “The average customer call handle time has increased by 45 seconds over the last quarter, leading to a 15% rise in customer complaints related to long wait times.”

Identify Customers and VOC (Voice of the Customer): Understand who the process serves and what their needs, expectations, and pain points are. Tools like surveys, interviews, and focus groups are useful here.

Tools Used :

  • CTQ Tree
  • Voice of Customer
  • Voice of Business
  • Kano Analysis
  • Stakeholder analysis
B. Develop a Project Charter:

This is the project’s mission document. It authorizes the project and includes:

· Business Case: Why is this project important?

· Problem Statement

· *Goal Statement: What specific, measurable metric are we trying to impact? (e.g., “Reduce average handle time by 30 seconds within 4 months.”)

· Project Scope: What is in and, crucially, what is out of bounds for this project?

· Timeline & Milestones

· Team Members & Roles

· Stakeholder Identification

Tools Used :

  • Project Charter
  • RACI Chart
C. Define process steps

SIPOC Diagram (Suppliers, Inputs, Process, Outputs, Customers): This high-level map provides a macro view of the process, helping to define boundaries and identify all relevant elements before deep diving.

Output of the Define Phase: A approved project charter, a well-understood problem, and a aligned team ready to move forward.

tools used :

  • Value Stream Mapping
  • SIPOC

DMAIC Phase 2: Measure

 

The Goal: To quantify the current process performance by establishing a baseline. This phase is about collecting data to understand the magnitude of the problem and to provide a factual basis for future improvement comparisons.

You can’t improve what you can’t measure. The Measure phase moves the team from opinions to hard data.

DMAIC Measure Key Activities & Tools:

A.Measurement System Analysis

· Map the Process: Create a detailed process map (or flowchart) of the current “as-is” state. This helps everyone visualize the process, identify all steps, and pinpoint where delays or redundancies might occur.

· Identify Key Metrics: Determine what Critical-to-Quality (CTQ) characteristics you need to measure. In our call center example, this would be “Average Handle Time” (AHT).

· Develop a Data Collection Plan: Plan how you will gather data. This includes:

· What data to collect? (e.g., call duration)

· Where to collect it? (e.g., from the phone system logs)

· How to collect it? (e.g., automatically exported report)

· Who will collect it?

· How much data is needed? (Sample size)

· Validate Measurement System: Ensure your measurement system is accurate and reliable. A Gage R&R (Repeatability & Reproducibility) study might be used to ensure your measuring tool isn’t contributing to data variation.

 

B. Define process Y’s

· Collect Baseline Data: Gather the data according to your plan.

C. Current Process Capability:

Using statistical tools, determine the current sigma level of your process. How is it performing relative to the customer’s specifications? Common metrics include DPMO, Sigma Level, and Process Capability Indices (Cp, Cpk).

Output of the Measure Phase: A data-backed baseline performance metric, a detailed process map, and a validated system for ongoing measurement.

Tools Used detail see on our blog post six sigma tools 

  • Data Collection Plan
  • Sample Size Calculator
  • Measurement System Analysis
  • Rule of 10
  • Gauge R & R
  • Gauge type 1
  • attribute gauge study
  • Calibrations
  • Waste Analysis
  • Process Capability
  • Spaghetti Diagram
  • Process Mapping
  • Swimlane Diagram

DMAIC Phase 3: Analyze

 

The Goal: To identify the root cause(s) of the problem or defect. This is the diagnostic phase where data is scrutinized to move from potential causes to the fundamental root cause(s).

Many teams make the critical mistake of skipping a rigorous Analyze phase and jumping to solutions. This often leads to solving symptoms, not the real problem.

 

DMAIC Analyze Key Activities & Tools:

 

· Analyze Data: Use statistical analysis to identify patterns, trends, and sources of variation in the data you collected.

· Descriptive Statistics: Mean, median, mode, standard deviation.

· Graphical Tools:

· Histograms: To view the distribution of data.

· Pareto Charts: To identify the “vital few” causes that contribute to the majority of the problem (the 80/20 rule).

· Scatter Plots: To investigate potential relationships between variables.

· Run Charts: To see how a process performs over time.

· Identify Root Causes: Drill down from potential causes to the verified root cause.

· 5 Whys: A simple but powerful technique of asking “Why?” repeatedly until you reach the underlying cause.

· Cause-and-Effect Diagram (Fishbone or Ishikawa Diagram): A brainstorming tool used to visually map out and categorize all potential causes of a problem (e.g., categories: People, Methods, Machines, Materials, Measurement, Environment).

· Validate Root Causes: It is not enough to simply brainstorm causes. You must use data to verify which of the potential causes are actually correlated with and contributing to the problem. This is where hypothesis testing (e.g., t-tests, ANOVA) can be used.

 

Output of the Analyze Phase: A data-validated, shortlist of fundamental root causes that, if addressed, will eliminate the problem.

 

Phase 4: Improve

 

The Goal: To develop, test, and implement solutions that address and eliminate the root causes identified in the Analyze phase.

 

This is the creative and experimental phase where the team designs the future state of the process.

 

Key Activities & Tools:

 

· Generate Potential Solutions: Brainstorm a wide range of creative solutions to address the confirmed root causes. Techniques like brainstorming, mind mapping, and Pugh Matrix (for evaluating concepts) are effective.

· Evaluate and Select Solutions: Assess the potential solutions based on criteria like:

· Effectiveness at addressing the root cause

· Cost to implement

· Time required

· Risk involved

· Impact on other processes

· Pilot Test the Solution: Before a full-scale rollout, conduct a small-scale pilot or experiment. This allows you to:

· Verify that the solution works as intended.

· Identify any unintended consequences.

· Fine-tune the solution design.

· Build buy-in by demonstrating success.

· Implement the Solution: Develop a full implementation plan, including steps, timelines, and responsibilities. Roll out the solution to the entire process or population. This often involves:

· Process redesign

· Training employees on the new method

· Updating documentation and work instructions

· FMEA (Failure Mode and Effects Analysis): A proactive tool used to identify what could go wrong with the new solution and to mitigate those risks before implementation.

 

Output of the Improve Phase: A tested, implemented solution that is shown to improve the baseline metric.

 

DMAIC Phase 5: Control

 

The Goal: To sustain the gains achieved in the Improve phase and ensure the process does not revert to its old way of operating. This is the phase that ensures long-term success.

 

Improvement is meaningless if it isn’t sustained. The Control phase is about institutionalizing the change.

 

DMAIC Control Phase Key Activities & Tools:

 

· Develop a Control Plan: This is a documented strategy to maintain the improved process. It includes:

· What metrics need to be monitored? (The same ones you measured at the start)

· How will they be monitored? (Dashboards, reports)

· How often? (Daily, weekly)

· Who is responsible?

· What are the response plans if the process shows signs of drifting?

· Implement Process Controls: This could involve:

· Statistical Process Control (SPC): Using control charts to monitor process behavior over time and distinguish between common cause (natural) variation and special cause (unnatural) variation that needs investigation.

· Standard Operating Procedures (SOPs): Documenting the new, improved process.

· Training and Communication: Ensuring all relevant personnel are trained on the new standard.

· Transfer Process Ownership: Hand over the control plan and responsibility for ongoing monitoring from the project team to the regular process owner (e.g., a department manager).

· Close the Project & Celebrate: Finalize all documentation, communicate the results and benefits to stakeholders, and celebrate the team’s success. This is crucial for morale and for promoting a continuous improvement culture.

 

Output of the Control Phase: A sustainable improved process, a control plan to monitor it, and a closed project with documented lessons learned.

 

Real-World Examples of DMAIC Success

 

· Manufacturing: A automotive parts manufacturer reduced weld defects by 85% by using DMAIC to identify and calibrate a faulty welding machine parameter (the root cause).

· Healthcare: A hospital used DMAIC to reduce patient wait times in the ER by 50% by analyzing patient flow and reallocating triage staff during peak hours.

· Finance: A bank’s loan processing department used DMAIC to cut its loan approval cycle time from 14 days to 7 days by eliminating redundant approval steps and automating document collection.

· Software/IT: A tech company used DMAIC to reduce its software deployment failure rate by analyzing code check-in data and implementing a new peer-review process.

 

Conclusion: Why DMAIC is a Game-Changer

 

The Six Sigma DMAIC methodology is more than just a set of steps; it’s a mindset of disciplined, data-driven problem-solving. Its power lies in its ability to:

· Replace Guessing with Data: It forces decisions to be based on factual evidence.

· Focus on Root Causes: It prevents the common and costly mistake of treating symptoms.

· Provide a Common Language: It creates a structured framework that teams can follow, improving collaboration and focus.

· Ensure Sustainability: The Control phase ensures that hard-won improvements are maintained long after the project team has disbanded.

 

Whether you are a large enterprise or a small business, embedding the DMAIC approach into your organization’s culture can lead to dramatic improvements in quality, efficiency, customer satisfaction, and ultimately, your bottom line. It is the proven path to achieving process perfection.

Ready to start your first DMAIC project? Begin with a small, well-defined problem, secure leadership support, and assemble a passionate team. The journey to operational excellence awaits.

Read our blog post below for Six sigma

  • Six sigma tools
  • ASQ Six Sigma Certification hidden cost

Frequently Asked Questions (FAQ) About Six Sigma DMAIC

 

The Six Sigma DMAIC methodology, while powerful, often brings up many questions for those new to it or considering its implementation. This FAQ section addresses the most common and critical questions we receive, providing deeper insights to complement our main guide.

1. What does DMAIC stand for?

 

DMAIC is an acronym for the five phases that define the methodology:

· D – Define

· M – Measure

· A – Analyze

· I – Improve

· C – Control

It represents a structured, data-driven problem-solving cycle used for improving, optimizing, and stabilizing existing processes and designs.

 

2. Is DMAIC only for manufacturing?

 

Absolutely not. This is one of the biggest misconceptions about Six Sigma. While it originated in manufacturing (at Motorola), the DMAIC framework is a universal problem-solving tool. Its principles of defining a problem, measuring performance, analyzing root causes, improving the process, and controlling the new standard are applicable to any sector. It is successfully used in:

 

· Healthcare: Reducing patient wait times, medication errors, and hospital-acquired infections.

· Finance: Streamlining loan approval processes, reducing transaction errors, and improving account reconciliation.

· Software/IT: Improving deployment success rates, reducing system downtime, and streamlining help desk ticket resolution.

· Logistics & Supply Chain: Optimizing delivery routes, reducing shipping damages, and improving warehouse picking accuracy.

· Human Resources: Improving employee onboarding processes and reducing time-to-fill for open positions.

 

Any process that has measurable inputs and outputs can be improved with DMAIC.

 

3. What’s the difference between DMAIC and DMADV?

 

This is a crucial distinction. Both are core methodologies of Six Sigma, but they are used for different purposes:

 

· DMAIC is used for improving an existing process that is broken, inefficient, or underperforming. The goal is to take a current process and make it better.

· DMADV (Define, Measure, Analyze, Design, Verify) is used for creating a new process, product, or service from scratch, specifically when the goal is to achieve Six Sigma quality levels from the very beginning. It’s also used when an existing process has been optimized through DMAIC but still doesn’t meet customer requirements and needs a complete redesign.

 

Think of it this way: Use DMAIC to repair and tune up an old car. Use DMADV to design and build a new, high-performance car.

 

4. How long does a typical DMAIC project take?

 

The timeline can vary significantly based on the project’s scope, complexity, and available resources. However:

 

· Small-scale projects (e.g., a single department process) led by a Green Belt might take 1-3 months.

· Medium to large-scale projects (e.g., cross-functional processes) led by a Black Belt typically take 3-6 months. A well-scoped project should not drag on for more than six months.The DMAIC structure is designed to create momentum and deliver results within a reasonable timeframe. Projects that take longer often suffer from scope creep or a lack of prioritization.

 

5. Do I need to be a certified Belt (Green/Black) to use DMAIC?

 

No, you do not. The DMAIC framework itself is a logical sequence of steps that anyone can learn and apply to problem-solving. Many organizations train their employees on the basics of DMAIC without formal certification.

 

However, certification becomes important for leading complex projects and driving an organization-wide culture of continuous improvement. Belt certifications signify a deeper, proven understanding of the advanced statistical tools and change management skills required for high-stakes projects.

 

· Yellow Belts understand basic concepts and assist project teams.

· Green Belts lead smaller projects and support Black Belts, part-time.

· Black Belts lead complex, cross-functional projects full-time and mentor Green Belts.

· Master Black Belts are strategic experts who mentor Black Belts, oversee the Six Sigma program, and align projects with company goals.

 

6. What are the most important tools used in each DMAIC phase?

 

While there are dozens of tools, some of the most critical and commonly used ones include:

 

· Define: Project Charter, SIPOC Diagram, Voice of the Customer (VOC) analysis.

· Measure: Process Mapping, Data Collection Plan, Basic Statistics (Mean, Median, Mode), Gage R&R (for measurement system analysis), Process Capability Analysis (Cp, Cpk).

· Analyze: Cause-and-Effect Diagram (Fishbone/Ishikawa), 5 Whys, Pareto Chart, Hypothesis Testing (e.g., t-tests, ANOVA), Regression Analysis, Scatter Plots.

· Improve: Brainstorming, Pilot Testing, Design of Experiments (DOE), Failure Mode and Effects Analysis (FMEA).

· Control: Control Plan, Statistical Process Control (SPC) Charts, Standard Operating Procedures (SOPs), Dashboards.

 

7. How is DMAIC different from Agile or Lean?

 

This is an excellent question, as these methodologies are often used together.

 

· DMAIC is a rigorous, data-intensive project framework for solving a specific, known problem. It’s designed for projects where the root cause is unknown and requires deep statistical analysis to uncover. It’s a “solve” methodology.

· Lean is a philosophy and set of tools focused on eliminating waste (e.g., waiting, overproduction, defects) to create more value for the customer with fewer resources. It’s about speed and efficiency. Tools like 5S and Value Stream Mapping are Lean.

· Agile is a project management approach originally from software development that emphasizes iterative work cycles (sprints), adaptability, and customer collaboration. It’s for managing work in complex, uncertain environments.

 

They are highly complementary. Many organizations use Lean Six Sigma (LSS), which combines Lean’s speed and waste-focused tools with Six Sigma’s data-driven rigor for defect reduction. A team might use Agile to manage the workflow of a DMAIC project.

 

8. What are the biggest challenges or reasons DMAIC projects fail?

 

DMAIC projects can fail for several reasons, most of which are preventable:

 

1. Poor Project Selection & Scope: Choosing a project not tied to business goals or having a scope that is too broad (“Boil the ocean”) or too narrow.

2. Lack of Leadership Support: Without clear sponsorship and resources from upper management, projects lose priority and stall.

3. Skipping Phases: The most common error is jumping from Define to Improve without spending enough time on Measure and Analyze. This leads to solving symptoms, not root causes.

4. Poor Data Quality: Basing critical decisions on inaccurate or insufficient data derails the entire analytical effort.

5. Ignoring the “People Side”: Failing to communicate with and involve process owners and stakeholders leads to resistance, making the Control phase impossible to sustain.

 

9. How do you measure the success and ROI of a DMAIC project?

 

Success is measured in two ways: Tangible (Hard) Savings and Intangible (Soft) Benefits.

 

· Tangible Savings are directly calculable financial benefits. This is the core of ROI calculation.

· Cost Reduction: e.g., reduced scrap, lower labor costs, less rework.

· Revenue Increase: e.g., increased capacity leading to more sales, higher customer retention.

· ROI Formula: (Project Savings – Project Cost) / Project Cost * 100

· Intangible Benefits are positive outcomes that are difficult to quantify financially but are still crucial.

· Improved customer satisfaction

· Improved employee morale

· Reduced cycle time

· Enhanced brand reputation

 

A successful project should have a mix of both. The project charter defined in the Define phase should outline the specific financial metrics the project is expected to impact.

 

10. Can small businesses benefit from DMAIC, or is it only for large corporations?

 

Small businesses can benefit enormously from DMAIC. In fact, the structured approach can be even more valuable for a small business where resources are scarce and process inefficiencies can have a disproportionately large impact on survival and profitability.

 

The key for small businesses is to scale the methodology appropriately. This means:

 

· Focusing on small, high-impact projects.

· Using the core DMAIC logic without getting bogged down in the most advanced statistical tools.

· Leveraging many of the simpler tools like process mapping, 5 Whys, and Pareto charts, which require no special software or advanced training. The goal isn’t to achieve a Six Sigma level of perfection on day one but to instill a culture of disciplined,data-based problem-solving.

 

11. What software is used for DMAIC projects?

 

DMAIC can be executed with simple tools, but specialized software can enhance data analysis.

 

· Basic: Microsoft Excel and PowerPoint are sufficient for many tools (charts, basic stats, graphs).

· Intermediate: Minitab, JMP, and SigmaXL are the industry-standard statistical software packages used for advanced analysis like hypothesis testing, DOE, and control charts.

· Advanced/Enterprise: Software platforms like Siemens Opcenter (formerly SIMATIC IT UAD), JMP Pro, and proprietary systems help large organizations manage portfolios of projects, track benefits, and share knowledge.

 

12. How does DMAIC relate to innovation?

 

While DMAIC is focused on incremental improvement of existing processes, it creates the capacity for innovation. By systematically eliminating errors, rework, and inefficiency in core processes, DMAIC frees up time, capital, and human resources that can then be redirected toward true innovation and growth initiatives. It makes the organization more efficient and stable, providing a solid foundation from which to innovate.

 

13. Is the “Control” phase really that important?

 

Yes, it is arguably the most important phase. The Control phase is what separates a temporary “fix” from a lasting improvement. Without a robust Control Plan, processes have a powerful tendency to revert to their old, familiar ways (a phenomenon known as “backsliding”). The Control phase ensures that the new, improved process becomes the new standard way of working, locking in the gains and delivering a lasting return on investment.

 

14. Where can I get trained or certified in DMAIC?

 

Training and certification options vary:

 

· Corporate Programs: Many large companies have internal Six Sigma certification programs for their employees.

· Universities & Colleges: Many institutions offer Lean Six Sigma courses and certification as part of their continuing education or business programs.

· Professional Training Organizations: Reputable organizations like the American Society for Quality (ASQ), the International Association for Six Sigma Certification (IASSC), and many private consultancies offer belt certifications. When choosing a provider,look for one that emphasizes hands-on, project-based learning rather than just theoretical knowledge.

 

We hope this FAQ has answered your most pressing questions about the Six Sigma DMAIC methodology. If you have more questions, feel free to reach out or explore the rest of our comprehensive guide.

 

Tags: DMAIClean six sigma
Share297Tweet186Share74
Previous Post

How to Make Hoshin Kanri X Matrix (Step-by-Step Guide)

Next Post

Six Sigma vs AI: Future Talent Outlook in Continuous Improvement

Aji

Aji

Hi there welcome to leandemy.com, with decade of experience in lean and manufacturing I'd love to share ideas and know how to better understand of lean practice

Related Posts

Six Sigma Green Belt Cost
Foster Lean culture

Six Sigma Green Belt Cost : Evaluating true cost and how it boost your career

Six Sigma Green Belt Cost , How much does it cost ? as pivotal skills and valuable credentials. And emphasizing your ability to use Six sigma tools In the realm of professional development, individuals are constantly...

by Aji
January 11, 2024 - Updated on January 28, 2024
six sigma tools
Lean production System

Six Sigma Tools : Mastering 55 tools to Unlock Profitable Growth

In the rapidly evolving business landscape, continuous improvement is not just a goal but a necessity. Histogram Graph below shown Implementation and usage of lean Six sigma tools in are increased. The graph below there are...

by Aji
January 9, 2024 - Updated on November 4, 2024
ASQ six sigma certification cost
Lean production System

ASQ six sigma certification Cost : Hidden cost you may avoid

Hidden cost you may avoid in Online six sigma certification. Here we did table for how much six sigma certification cost start from ASQ the one most favorable from recruiter. For detail on which certification step...

by Aji
October 25, 2023 - Updated on January 16, 2024
5S Audit
Lean metrics

How to plan 5s Audit [Bonus! 5s audit checklist Free template]

5S audit  are essentials program in lean manufacturing Tools. Tied with gemba walk It's widely known as basic tools to enhance the lean culture and productivity.  Many mistakes are bound to happens since the 5s buzz words...

by Aji
July 19, 2023 - Updated on October 24, 2023
Six sigma certification cost
Lean six sigma Tools

Six sigma Certification Cost : 3 things you need to consider [2024]

six sigma certification cost? Are you wondering how much is it? Look at our interactive graph below Six sigma certifications are one of the best add value in your resume, Why ?it is shown your ability...

by Aji
June 10, 2023 - Updated on January 19, 2024
Next Post
Six Sigma vs AI: Future Talent Outlook in Continuous Improvement

Six Sigma vs AI: Future Talent Outlook in Continuous Improvement

Lean Manufacturing Roadmap

Lean Manufacturing Roadmap : Your Guide to Start the Transformation Journey

Please login to join discussion
ADVERTISEMENT
Leandemy

© 2025 Leandemy. All Rights Reserved.

Navigate Site

  • Home
  • Privacy Policy
  • Terms & Conditions
  • Refund and Returns Policy
  • About lendemy
  • Contact
  • Lean six sigma Tools
  • Lean production System
  • Lean metrics
  • Foster Lean culture

Follow Us

No Result
View All Result
  • My Account
  • Shop
  • Blog
  • Contact
  • Login
  • Sign Up
  • Cart

© 2025 Leandemy. All Rights Reserved.

Welcome Back!

Sign In with Facebook
Sign In with Google
Sign In with Linked In
OR

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Sign Up with Facebook
Sign Up with Google
Sign Up with Linked In
OR

Fill the forms below to register

*By registering into our website, you agree to the Terms & Conditions and Privacy Policy.
All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.